Category Archives: crack repair

Hoover Dam Demonstration Project Update

Project Update: Almost 7 years after application, this Roadware 10 Minute Concrete Mender™ and MatchCrete™ Clear repair still looks good.
Concrete repair with Roadware MatchCrete Cleat and Concrete Mender at Hoover Dam almost 7 years after application.
Roadware Hoover Dam Demonstration Project
Use Roadware 10 Minute Concrete Mender and MatchCrete™ Clear to make decorative and color matching repairs.

 

1) Top of dam shows various cracks.

 

2) Damage is built up with Roadware 10 Minute Concrete Mender.

 

3) A top layer of MatchCrete™ and matching brown silica sand is applied.

 

4) Structurally bonded and blended well with surrounding concrete.

Special thanks to Randy Sisson and Minitman Supply Colorado for sending this in.

Roadware YouTube Channel Hits 2 Million Views

The Roadware YouTube Channel hits TWO MILLION VIEWS. Roadware maintains a YouTube video channel that shows Roadware products in action. This month our channel surpassed two million views. The YouTube channel currently has over 50 in-house produced videos showing simple concrete crack repair to advanced decorative and exposed aggregate concrete repairs. Check it out here. Two million views accounts for about 3.8 million watched minutes. That’s about 63,000 hours of watch time.

Here is a gallery of Roadware videos from the Roadware YouTube Channel.

Floor repair stands up to forklift damage.

 

The Microdoweling™ action of Roadware 10 Minute Concrete Mender™ can structurally, “glue” concrete back together. Pictured here is a concrete break-out caused by a forklift hitting an anchored steel bollard.

Anchored post hit with forklift causing damage to floor.

 

Concrete Mender™ was used to re-attach the broken concrete piece and repair the crack.

Damaged floor anchoring steel post is repaired and loose concrete piece re-attached with Concrete Mender™.

 

After about 10 minutes, the repair was buffed smooth and open for traffic.

Concrete Mender™ repair is buffed smooth and ready for service.

 

About a week later, the bollard was again hit with a forklift and at the same angle. The repaired concrete held in place. The concrete broke on the other side of the bollard this time. Concrete Mender can’t stop forklifts from hitting bollards. It can help minimize the damage and make lasting repairs.

Concrete Mender floor repair one week after installation. The steel post was hit again with a forklift and is still holding in place.

Busiest Cargo Gateway Airport in the World uses Flexible Cement II – HKG Hong Kong China

The Hong Kong International airport HKG is home to the world’s busiest cargo gateway airport. In 2015, HKG moved over 4.38 million metric tonnes of air cargo.  It is also one of the world’s business passenger airports accommodating over 68 million passengers that same year.

HKG Airport at night
HKG Airport at night

Operations at the world’s busiest cargo airport run 24/7/365 without stopping. Maintenance crews need a crack and joint repair material that can be applied in a wide range of conditions and be ready for service in minutes. Roadware Flexible Cement II  is a tough polyurethane crack repair material that can be applied at any ambient temperature. It bonds very well to distressed concrete and forms a tough semi-elastic polymer that will withstand heavy airline traffic in about 15 minutes. Crews at HKG airport have relied on Roadware Flexible Cement II to make repairs whenever and wherever needed for over 5 years.

Maintenance workers repair the taxiway with Roadware Flexible Cement II.
Maintenance workers repair a taxiway at night with Roadware Flexible Cement II.

 

Crews use Roadware Flexible Cement II in 600ml cartridges to quickly repair concrete cracks in a taxiway at HKG airport.
Crews use Roadware Flexible Cement II in 600ml cartridges to quickly repair concrete cracks in a taxiway at HKG airport.

 

HKG crews use Flexible Cement II to seal cracks near an in-ground refueling port in damp conditions.
HKG crews use Flexible Cement II to seal cracks damp conditions.

 

Roadware Flexible Cement II™ 300x300ml cartridge Item #91300
Roadware Flexible Cement II™ 300x300ml cartridge Item #91300

 

 

Concrete Polishing and Staining Conference Free Registration

Roadware is exhibiting at the CP&S show in Milwaukee on October 20-22, 2016 in booth #119. NOW #219

The International Concrete Polishing & Staining Conference and Expo is the only event of its kind specifically designed for concrete polishing professionals. This show offers 20+ conference sessions, an Exhibit Hall featuring polishing equipment and products, slab demonstrations and more.

To take advantage of our exclusive VIP offer for free access to the CP&S Exhibit Hall, simply enter promo code RINC when registering online. We look forward to seeing you at the show! P.S. Be sure to check out the CP&S Conference, offering more than 20 technical and business management sessions geared specifically for concrete polishing professionals!

On Wednesday, October 19 … CP&S is offering Brad Humphrey’s All-Day Leadership Boot Camp for contractor owners and employee leaders in ANY construction business. With more than 35 years in the industry, Brad is a veteran construction contractor and coach who is in high demand throughout the industry. Don’t miss this intensive, all-day coaching session to help you take your company to the next level!

Crack Repair Under VCT or Laminate Flooring

Use Concrete Mender™ to repair  cracks, joints and curling slabs under VCT or tile floors. The permanent performance and 10 minute cure turns this 2 day job into a one day (or one night) job. Keep business running with minimal down time.

Repairing control or contraction joints under VCT.
Repairing contraction joints under VCT.

For spalled or failed control joints that are reflecting through the tile and the slabs are not curled, clean out the joints with a dust collecting diamond grinder.

Control or contraction joints repaired with 10 Minute Concrete Mender™ under VCT.
Control or contraction joints repaired with 10 Minute Concrete Mender™ under VCT.

Repair the control joints with Roadware 10 Minute Concrete Mender™, grind the surface flush and replace the tile.

 

For curled and buckled slabs, a major retailer specifies this heavy duty solution. This is the ultimate fix it once and fix it forever repair.

crack-repair-concrete-mender-vct-flooring_03

Step 1: Remove VCT, Ceramic, or vinyl floor coverings.

 

crack-repair-concrete-mender-vct-flooring_06

Step 2: Saw cut parallel lines to the crack at a depth of no less than 1.5 inches. Ideally 30% of the slab depth.

 

crack-repair-concrete-mender-vct-flooring_08

Step 3: Chip out the concrete between the saw cuts. Clean the surface well with a wire brush and vacuum.

 

crack-repair-concrete-mender-vct-flooring_10

Step 4: Add Roadware 10 Minute Concrete Mender and Sand to the finished grade. Also use Concrete Mender to repair the underlaying crack. See Concrete Mender™ Bulk Application Instructions.

 

crack-repair-concrete-mender-vct-flooring_13

Step 5: Replace the floor treatment and open to store traffic.

 

 

Stamped Concrete Patio Pop-out Repair

Repairing seasonal pop-outs in stamped and colored concrete is easy with MatchCrete™ Clear. Just add some powered pigment or grout to the clear MatchCrete™ aliphatic polyurethane and you can match most any color. Come back after 24 hours and give the repairs a light sanding to blend them in. See the short video below.

Repairing pop-outs in stamped decorative concrete with MatchCrete™ Clear and added dry pigments.
Repairing pop-outs in stamped decorative concrete with MatchCrete™ Clear and added dry pigments.

Roadware 10 Minute Concrete Mender™ Top Applications

Roadware 10 Minute Concrete Mender™ top applications:

General full depth crack repair:

Use the high-penetration abilities of Roadware 10 Minute Concrete Mender™ to make full depth crack repair.

 

CRACK REPAIR

1. Clean out with diamond grinder and remove dirt and dust.
2. Flood with Roadware 10 Minute Concrete Mender™
3. Add a fine graded silica sand and additional liquid to grade.
4. Strike off excess material and allow to cure for 10 minutes at 70°F.
5. Open to traffic. Finish and blend with a grinding stone if desired.

 

SPALL REPAIR

1. Clean out with diamond grinder and remove dirt and dust.
2. Flood with Roadware 10 Minute Concrete Mender™
3. Add a fine graded silica sand and additional liquid. Work in one inch lifts to grade.
4. Strike off excess material and allow to cure for 10 minutes at 70°F.
5. Open to traffic. Finish and blend with a grinding stone if desired.

HAIRLINE CRACKS

1. Score the top of the crack with diamond blade or wire brush.
2. Remove dust with a vaccume.
3. Flood with Roadware 10 Minute Concrete
Mender™ supplied in twin cartridges and optional needle tip mixer.
4. Add a fine graded silica sand to larger areas and allow to soak in.
5. Strike off excess material and allow to
cure for 10 minutes at 70° F.
6. Open to traffic. Finish and blend with a
grinding stone if desired.

SPALLED CONTROL JOINT

(Fully cured non-moving)
1. Clean out with diamond grinder and remove dirt and dust. Score back spall with blade for a finished look.
2. Flood with Roadware 10 Minute Concrete Mender™
3. Add a fine graded silica sand and additional liquid to grade.
4. Strike off excess material and allow to cure for 10 minutes at 70°F.
5. Open to traffic. Finish and blend with a grinding stone if desired.

DELAMINATED SLAB

1. Drill hole into void.
2. Remove dust with a vacuum.
3. Flood with Roadware 10 Minute Concrete
Mender™ supplied in twin cartridges.
4. Add a fine graded silica sand and
additional liquid to fill holes to grade.
5. Strike off excess material and allow to
cure for 10 minutes at 70° F.
6. Open to traffic. Finish and blend with a
grinding stone if desired.

THRESHOLDS AND
UNEVEN SLABS

1. Clean out with diamond or wire grinder and remove dirt and dust. Score lower edge with diamond blade for a finished look.
2. Flood with Roadware 10 Minute Concrete Mender™
3. Add a fine graded silica sand and additional liquid to a mortar consistency.
4. Shape with a clean steel trowel and allow to cure for 10 minutes at 70° F.
5. Open to traffic. Finish and blend with a grinding stone if desired. Maintain existing expansion joint if necessary.